top of page

In the spring of 2017 the ceiling panels finally fell in. The roof was so weak!

In November of 2017 construction began. The roof is getting repaired!

As the roof is getting worked on the people in the community are finishing the small bathroom building. Doors, window, and toilets are installed.

BAJA CHURCH RESTORATION MISSION   Non-Profit 501 (c)(3) EIN 81-0791240

MAKE CHECKS OUT TO: (BCRM)

2120 Hamer Dr.

Placentia, CA 92870

Direct: ​714.920.1947

Email: casadelase@gmail.com

 

bottom of page